Interior-only contractors may install what was drawn months ago while site conditions changed. A design-build approach updates details as masonry and services evolve.
Documentation
Elevation drawings, electrical plans, and finish schedules should match the approved BOQ to avoid substitution disputes.
Factory and site coordination
Modular components need measured openings; site carpentry needs moisture-safe storage—both need timeline buffers.
Learn more about interior design services or interior designers in Mavelikara.